top of page
20220908_162759.jpg

E 81st Street 

     Replacing the main Waste line

20220815_155310.jpg

  Installing one way valve for waste line

20220830_162301.jpg

  Installing one way valve for waste line

20240119_112306_edited.jpg

     Replacing the main Waste line

20220830_144014.jpg

  Installing one way valve for waste line

20220913_161006_edited.jpg

Installing tiles  covering the waste line

20220908_162751_edited.jpg
bottom of page